What pre-leasing goals define project viability before breaking ground?

Hello LandBank

Pre-leasing goals are crucial benchmarks that help determine whether an industrial development project is viable before construction begins. These goals provide confidence to investors, lenders, and developers by demonstrating market demand, projected cash flows, and risk mitigation. They serve as commercial validation of the project and are often used as prerequisites for financial closure and construction mobilization. Below are five key pre-leasing goals that commonly define project viability:

1. Minimum Pre-Leased Floor Area or Plot Commitment

  • Establishes a threshold percentage of total leasable space that must be committed through signed Letters of Intent (LOIs) or lease agreements before construction.
  • Typically ranges from 25% to 50%, depending on market confidence and financing structure.
  • Signals demand depth and support financial modeling for debt servicing and operating costs.
  • It may be applied phase-wise in large parks to allow progressive development.

2. Anchor Tenant Confirmation

  • Securing one or more anchor tenants (major occupiers) is a critical goal for triggering project launch.
  • These tenants often:
    • Occupy significant space (e.g., 20%–40% of the project)
    • Provide long-term lease commitments (5–10 years)
    • Bring brand credibility and draw additional tenants (network effect)
  • May include pre-negotiated incentives like fit-out support or lock-in periods.

3. Lease Rate Benchmarks and Yield Validation

  • Pre-leasing goals include achieving targeted rental rates that align with the project’s IRR and return metrics.
  • Lease agreements should reflect:
    • Market-aligned base rent (per sq ft.)
    • Escalation clauses (e.g., 5%–7% per annum)
    • Minimum lock-in and security deposit norms
  • These terms must validate the developer’s assumptions on capital stack feasibility and project break-even.

4. Credit Quality and Tenant Profile Requirements

  • Projects often define pre-leasing goals based on creditworthiness and industry fit of tenants.
  • Target tenant profiles may include:
    • Multinational logistics operators
    • E-commerce or FMCG firms with warehouse needs
    • Manufacturing units aligned with the state industrial policy.
  • High-quality tenants improve financeability and reduce vacancy risk.

5. Pre-Commitments for Shared Infrastructure Use

  • In industrial parks or multi-tenant logistics clusters, developers may require tenant commitment to shared services:
    • Utility pre-booking (power, water)
    • Common amenities (parking, security, waste management)
    • Maintenance fee agreements
  • These commitments support operational sustainability and make the project bankable.

Join The Discussion

Compare listings

Compare