Hospitality developments—especially hotels and extended-stay properties—require robust infrastructure upgrades to meet operational needs, ensure guest safety, and comply with municipal development standards. Because hotels typically involve high occupancy, 24/7 operations, and intensive building systems, cities and utility providers often impose enhanced requirements for utilities, stormwater management, and emergency services. These upgrades must be planned during entitlements and engineering design to avoid costly delays or redesigns.
1. Utility Capacity and Connection Requirements
- Water Supply: Hotels require high-capacity water service for domestic use, laundry, kitchens, HVAC systems, and fire suppression.
- Larger water meters or multiple taps may be needed.
- Flow tests may be required to validate hydrant and fire line adequacy.
- Pressure zones and backflow preventers must be evaluated and approved by the local water authority.
- Larger water meters or multiple taps may be needed.
- Sewer Infrastructure: Hospitality uses generate significant wastewater from guest rooms, kitchens, and common areas.
- A sewer capacity analysis may be required to confirm system readiness.
- Grease traps or oil-water separators may be mandated for kitchens or food-service operations.
- Projects may trigger sewer connection fees or demand off-site upgrades if existing mains are undersized.
- A sewer capacity analysis may be required to confirm system readiness.
- Electric and Gas: Hotels rely heavily on electrical systems for HVAC, elevators, lighting, and automation systems.
- Developers may need to install or upgrade transformers, switchgear, or underground conduits.
- Natural gas service (if used for boilers or cooking) must be sized and approved by the utility provider.
- Coordination with utility companies is often required 6–12 months before construction.
- Developers may need to install or upgrade transformers, switchgear, or underground conduits.
2. Stormwater Management Systems
- Most cities require new developments to meet post-construction stormwater treatment standards, especially for impervious surfaces.
- Hotels must install detention basins, bio-retention swales, permeable pavement, or underground vaults to manage runoff.
- Grading and drainage plans must direct flows away from adjacent properties and public ROWs.
- In some cases, regional stormwater fees are imposed if the developer connects to an existing basin.
- Hotels must install detention basins, bio-retention swales, permeable pavement, or underground vaults to manage runoff.
- Stormwater systems must be designed for both peak flows (e.g., 100-year storm) and water quality treatment (e.g., first flush capture).
- An engineer’s hydrology report is typically submitted during site plan review.
- An engineer’s hydrology report is typically submitted during site plan review.
3. Fire Department Access and Suppression Standards
- Hospitality projects require strict compliance with fire access and emergency response regulations.
- Hotels must include minimum 20–26 ft wide fire lanes, with unobstructed turnaround zones for fire apparatus.
- Access must reach within 150 feet of all portions of the building’s exterior.
- Multi-story or corridor-based hotels must have sprinkler systems and standpipe systems designed to NFPA and local code.
- Hotels must include minimum 20–26 ft wide fire lanes, with unobstructed turnaround zones for fire apparatus.
- Coordination with the fire marshal or fire prevention officer is required to approve:
- Hydrant locations and spacing (typically every 300–400 feet)
- Alarm and suppression system plans
- Elevator recall and emergency signage compliance
- Fire command center placement (for full-service hotels)
- Hydrant locations and spacing (typically every 300–400 feet)
4. Telecom, Fiber, and EV Infrastructure
- High guest expectations for connectivity require installation of fiber internet, redundant service pathways, and adequate telecom closet space.
- Some jurisdictions require new developments to be “fiber-ready” with conduits and pull strings in place.
- Electrical upgrades for EV charging stations (Level 2 or DC fast chargers) may be mandated by code or brand standard.
- Panel capacity and transformer sizing must include EV future demand forecasts.
- Some jurisdictions require new developments to be “fiber-ready” with conduits and pull strings in place.
5. Off-Site and Public Right-of-Way Improvements
- New hotel developments often trigger street improvements along parcel frontages, including:
- New curb, gutter, and sidewalk installations
- ADA-compliant ramps and pedestrian crossings
- Streetlights and signage installation or relocation
- Bus stop upgrades (if within transit corridors)
- New curb, gutter, and sidewalk installations
- Traffic impact studies may require turn lane additions, signal modifications, or striping changes to ensure safe ingress/egress.