What are the typical project timelines post-acquisition?

Hello LandBank

After land acquisition, a construction or development project progresses through a series of structured phases. These timelines vary depending on the type of project (residential, commercial, industrial), regulatory environment, land condition, financing, and scale. However, most projects follow a standard lifecycle comprising pre-construction, construction, and post-construction stages.

1. Pre-Development and Planning Phase (2 to 6 Months)

This stage begins immediately after acquisition and involves:

  • Site surveys and soil investigations
  • Appointing architects, planners, and consultants
  • Preparing concept designs and master layouts
  • Evaluating feasibility (technical, legal, environmental)
  • Finalizing the project budget and funding strategy

This phase includes internal team formation and coordination with legal, engineering, and design professionals.

2. Regulatory Approvals and Permits Phase (3 to 12 Months)

During this phase, developers obtain mandatory approvals from various government authorities. Key processes include:

  • Land use conversion (if applicable)
  • Building plan sanctioning
  • Fire and environmental clearances
  • Layout or township approval (for large plots)
  • No Objection Certificates (NOCs) from utility departments
  • Registration with RERA or other statutory bodies (for residential or commercial projects)

Delays can occur if documentation is incomplete or if the land is located in sensitive or zoned areas.

3. Financial Closure and Procurement Phase (2 to 6 Months)

This stage overlaps with or follows regulatory approvals and involves:

  • Securing construction loans or private equity funding
  • Finalizing tenders and contracts with contractors and vendors
  • Planning procurement schedules for raw materials, machinery, and manpower

Pre-booking or pre-leasing may begin at this point to build investor or buyer interest.

4. Construction Phase (12 to 36 Months)

This is the core implementation phase and includes:

  • Site mobilization and ground-breaking
  • Excavation, foundation laying, and structural work
  • MEP (Mechanical, Electrical, Plumbing) installations
  • Finishing work (interiors, façade, utilities)

Timelines vary:

  • Small commercial or residential buildings may take 12 to 18 months
  • Large-scale industrial, institutional, or high-rise developments can extend to 24 to 36 months or more

Project pace is influenced by weather, material supply, labor availability, and design complexity.

5. Completion Certification and Handover Phase (2 to 6 Months)

Once construction ends, the developer must secure:

  • Completion Certificate (CC)
  • Occupancy Certificate (OC)
  • Fire safety clearance
  • Final utility connections (water, power, sewage)

Marketing, final inspections, customer walkthroughs, and registration of units happen during this period. For industrial and commercial use, operational setup or leasing to tenants may begin.

6. Post-Handover Phase and Defect Liability Period (6 to 24 Months)

After units are handed over to owners or tenants, developers remain responsible for:

  • Rectifying structural defects or service issues
  • Managing facilities (if under developer-maintained schemes)
  • Ensuring compliance with sustainability and safety audits

For residential buildings under RERA, the typical defect liability period is five years, although active engagement is high during the initial 6 to 24 months.