Commercial Investment

Hello LandBank

What site access and circulation patterns support large-vehicle traffic, deliveries, and employee parking?

Multiple Access Points for Entry and Exit Separate, well-located driveways help distribute traffic and reduce congestion during peak hours At least two access points are recommended to separate truck and employee vehicles Entrances should be aligned with public road intersections for better visibility Wide curb cuts and reinforced pavement are essential for heavy-vehicle maneuvering Gate...

Hello LandBank

What infrastructure upgrades (roads, utilities, broadband) are necessary to serve multiple buildings?

Road and Internal Circulation Improvements Well-designed access roads and internal circulation systems are essential for safety, efficiency, and code compliance Requires loop or spine roads to connect multiple buildings with adequate turning radii Driveways must accommodate delivery trucks, emergency vehicles, and employee traffic Intersection upgrades may be necessary at site entry points to...

Hello LandBank

What minimum land area is required to support a viable multi-tenant business park layout?

Baseline Land Area Requirements A functional multi-tenant business park typically requires a minimum contiguous land parcel of 5 to 15 acres 5 acres may support a small-scale campus with 2–3 buildings and surface parking 10 to 15 acres enable flexible phasing and larger tenant spaces (20,000–100,000+ sq ft each) Allows room for shared amenities like internal roads, stormwater ponds, and...

Hello LandBank

What zoning and land use classifications support office or business park development?

Commercial Office (CO) and Business District Zoning These zones are specifically designated for professional, administrative, and corporate office uses Typically allow mid- to high-rise office buildings, medical offices, and service hubs Emphasize low-impact, daytime uses with limited traffic generation Often include development standards for landscaping, parking, and signage May allow...

Hello LandBank

What impact does lot shape, access, and frontage have on the assembled site’s usability?

Lot Shape and Site Efficiency The geometric configuration of the assembled parcels directly affects layout flexibility and design efficiency Rectangular or square parcels support efficient building footprints and circulation Irregular or L-shaped lots may restrict access, light, or usable depth Narrow lots can limit parking layout, drive-thru design, or bay spacing Unified geometry...

Hello LandBank

What interim uses (parking, staging, leasing) can generate income during the assembly process?

Surface Parking and Vehicle Storage Vacant lots can be temporarily converted into parking facilities to generate short-term cash flow Hourly or monthly parking leases cater to nearby businesses, residents, or commuters Event-based parking can yield high returns in entertainment or stadium districts Storage of commercial fleets, buses, or construction vehicles provides stable income Minimal...

Hello LandBank

What valuation differences exist between individual lots and the unified assembled parcel?

Aggregated Parcel Value Uplift A unified, assembled parcel often holds a significantly higher value than the sum of its individual lots Assembled land allows larger-scale development, increasing per square foot utility Higher zoning potential (FAR, height) becomes viable once site size thresholds are met Parcel unity reduces site inefficiencies like duplicate driveways or...

Hello LandBank

What timeline is realistic for completing land assembly without disrupting entitlement schedules?

Typical Land Assembly Duration The full process of identifying, negotiating, and securing parcels can take 12 to 36 months depending on site complexity Smaller sites with few owners may be completed in under a year Large or fragmented parcels with multiple stakeholders often require two to three years Timing depends on seller responsiveness, legal due diligence, and valuation gaps External...

Hello LandBank

What holdout risk or pricing premiums exist with owners of key or corner parcels?

Strategic Value of Corner or Anchor Parcels Corner and high-visibility parcels often control access, layout, or zoning potential for the entire site Offer multiple frontages that enhance site circulation and commercial visibility Often eligible for higher FAR or height allowances in urban overlays Essential for drive-throughs, access easements, or unified design flow Without control of...

Hello LandBank

What legal instruments (option agreements, purchase rights) help control parcels before full acquisition?

Option Agreements Option agreements give the buyer the exclusive right to purchase a property within a defined timeframe Allows site control without immediate purchase obligation Often includes an upfront option fee credited toward the purchase price Useful for conducting due diligence or securing entitlements before closing Protects against competing offers while buyer finalizes financing...

Compare listings

Compare